Beautification of Nabadiganta PDF Print E-mail

Project­­­­­­­-                     Beautification of Nabadiganta

 

The work of beautification has started by Nabadiganta Industrial Township Authority. The work covered under the bids consist of construction of passenger shelters, planting and nurturing of colourful trees and plants, road signs, pedestrian walkover, other street decorative furniture, streetlights wherever required considering 24 hour operation of IT & ITES, kiosks, STD/PCO booths, public conveniences, hoardings, display of advertisement etc. at different  sites within Sector – V of Salt Lake Bye Pass.

 

Brief descriptions of the works completed are:

  • 3 nos. of Fountains have been installed.
  • 33 new BQS has been installed.
  • Marble Stairs & Marble Seats have been created on Green Verge
  • Traffic Signals have been installed at Area & SDF.
  • Over 150 Palm trees have been installed between Bowler's Den & SDF.

 

Brief description of the beautification works going on are:

  • Repainting all curb stones in black & yellow
  • FRP Railings being installed on median between College More & Wipro
  • Creation of Green Lawn with seating Arrangement on Salt Lake By-pass Green Verge is in progress.
  • Creation of Walkway along Salt Lake Bypass Green Verge is under progress
  • Erection of Foot over Bridges on Salt Lake Bypass

 

Brief descriptions of the future plans are:

  • Installation of Traffic Signal at AL/BL Box Bridge.
  • Erection of Gantries on Salt Lake By-pass
  • Creation of Public Toilets on Salt Lake Bypass
  • Creation of Food Court at Nabadiganta